Flooring installation typically involves an initial site assessment of the area, either to install onto an existing concrete slab or substrate, or direct onto bearer and joists. We can quote to your specification or make recommendations for the best type of timber, laminate or vinyl material to use.
Once the installation method and measurements are confirmed, surface preparation and the installation process itself is undertaken. This can take anything from a couple of days to a few weeks depending on the size of the project. After the floor has been installed the coating or finish is then applied to protect the floor. Peninsula Floor Sanding & Polishing skilled installers also address subfloor issues, install moisture barriers if the concrete substrate is damp and requires separation from the floor. We also provide aftercare advice for the ongoing care and maintenance of the floor to ensure its integrity and appearance over time. A quality installation enhances the aesthetic appeal and longevity of timber floors, making them a popular choice among homeowners.
- Installation of solid timber flooring – widths from 65mm to 240mm
- Laminate, hybrid and vinyl flooring
- Installation of recycled or second hand flooring
- Installation of parquetry flooring, with borders if required
- Installation of stair treads and risers onto concrete stairs or steel stairs
- Finishing off details and trim e.g. – skirting boards, quad moulding, thresholds, doors cut down, caulking
- Patching in of old floorboards